A little remiss with this posting. On March 7th, we had our pre-construction meeting with our temporary sales rep (our regular sales rep was still out on maternity leave) and our project manager.
Our PM or new BFF seems to be a very capable guy (avoiding using the adjective young here as everyone is beginning to look young to me) who has been doing the job for several years and has delivered over a hundred homes and not missed one deadline.
We went over the entire build step by step, room by room, from front of the house to the back of the house. He was very detailed and went over each and every change we had made from the standard plan just to make sure he understood everything. Answered every question we had and addressed every concern.
They are going to work with us as best they can given the topography of our lot to make it as accessible as possible. Really concerned about having more than one step from stoop to the house and from the garage to the house. They can add some extra blocking in the shower to grab bar installation and said they would not remove any extra insulation that appeared in the exterior walls of the garage before the drywall goes up.
He went through the process of how inspections will be handled and how items that need to be fixed or replaced will be marked.
He said we are welcome to visit at anytime, but to not get in the way of the guys if they are on the job site.
Seems like we got a project manager we can work with. But still a long way to go.